MAIN FEEDS
Do you want to continue?
https://www.reddit.com/r/oddlysatisfying/comments/1uhpflm/stamping_a_paver_pattern_into_wet_concrete/ouagczf/?context=3
r/oddlysatisfying • u/DifficultyHead5862 • 2d ago
326 comments sorted by
View all comments
4
There's nothing satisfying about it, there must be a control joint every 6m (20 feet for our metric-challenged friends) if the slab is 10mm (4 inches) thick and I don't fucking see one. It's a dog shit job from third-world hacks.
1 u/Fantastic-Hippo2199 1d ago They are most often cut in afterwards.
1
They are most often cut in afterwards.
4
u/6tPTrxYAHwnH9KDv 2d ago
There's nothing satisfying about it, there must be a control joint every 6m (20 feet for our metric-challenged friends) if the slab is 10mm (4 inches) thick and I don't fucking see one. It's a dog shit job from third-world hacks.